Power ON.意思是什么?Switch to SETUP.Check that top probe is lowered against support arm.Insert .0625" gage block under probe.

来源:学生作业帮助网 编辑:作业帮 时间:2024/05/14 08:45:41
Power ON.意思是什么?Switch to SETUP.Check that top probe is lowered against support arm.Insert .0625

Power ON.意思是什么?Switch to SETUP.Check that top probe is lowered against support arm.Insert .0625" gage block under probe.
Power ON.意思是什么?Switch to SETUP.
Check that top probe is lowered against support arm.
Insert .0625" gage block under probe.

Power ON.意思是什么?Switch to SETUP.Check that top probe is lowered against support arm.Insert .0625" gage block under probe.
Power ON. 意思是“通电/接通电源/开启电源”
Switch to SETUP意思是“(将开关)转到设置(位置)”
Check that top probe is lowered against support arm.“检查一下顶部的探测器是否降低并抵住支撑臂.”
Insert .0625" gage block under probe.“在探测器下方插入0.0625"的计量块”
(不知翻译是否恰当,好像是机电方面的东西.)

电源打开